The towers (not designed as a Mono Tower system), with an optional ground plan and height, are created from a very robust welded structure, adapted for vertical storage of individual loading units. The Double Tower is adapted for storing of individual loading units in two towers (columns) against each other. The Multi Tower is combination of Double Towers. Containers (loading units) are welded structures, dimensioned according to typical shipping formats and weights of metallurgical profiles, bars and tubes.
The extractor, which is a part of the lifting manipulator, performs horizontal displacements of the loading unit from/to the storage location in both towers; the lifting manipulator moves the loading unit vertically from/to the transfer position. The construction of the horizontally moving trolley ensures container and material moving to a defined distance from the device.
Manipulation of the packages and individual bars is usually carried out by crane with belt or a magnet.
If there is request for manipulation of entire package by using a forklift, the system can be optionally equipped by material lifting system in operator area.
The double and multi tower system can be equipped with more operator areas, either at front, at back and/or at side machine position (depending on the design of the tower).
Container payload [t] | Material dimension [mm] |
Max. machine height [m] |
Operator area type | Material lifting | Module Control SW | Loading cells | |
---|---|---|---|---|---|---|---|
Double Tower |
1,5 / 3 / 5 |
Max. width 1000
6500 |
12 |
Front with trolley (optional: back/side) |
Optional |
Recommended |
Optional |
Multi Tower |
1,5 / 3 / 5 |
12 |
Front with trolley (optional: back/side) |
Optional |
Necessary |
Optional |